EX

Simulation & Prediction

Back to journey: Interconnect & Roaming

Scenario Simulation Workspace

Compare current state, no action, recommended, upside and downside scenarios for one journey or issue.

Journey

Interconnect & Roaming

KPI under simulation

Interconnect leakage

Current

0.6%

Target

No stored target

Scenario outcome cards

Current State

Base case

Current trajectory with in-flight initiatives only.

Stated outcome
Termination cost increase: +$4.8M / yr
Risk / trade-off
—
Interconnect leakage in 6 mo
0.6% ACTUAL
RecommendedRecommended

Renegotiate top-3

Reciprocal rate deals with top-3 partners.

Stated outcome
$1.1M / yr saved
Risk / trade-off
Partner pushback
Interconnect leakage in 6 mo
0.22% SCENARIO
Expected value
Cost reduced: USD 1.1M expected
Alternative

Re-route via hubs

Route traffic via lower-cost carrier hubs.

Stated outcome
$1.5M / yr saved
Risk / trade-off
Quality risk on routes
Interconnect leakage in 6 mo
not modelled
Alternative

Accept new rates

No renegotiation.

Stated outcome
$0
Risk / trade-off
Margin keeps falling
Interconnect leakage in 6 mo
not modelled

Not stored for this journey: No Action, Upside, Downside. Shown as a gap rather than invented.

Scenario comparison — stated value vs cost/risk (USD M)

Amounts parsed from each scenario's stored results; ★ = recommended. Non-monetary outcomes plot as zero.

Risk / return matrix

Top-left = high value for low stated cost/risk.

Interconnect leakage — actual vs scenario paths

ACTUALFORECASTSCENARIO

Same projection as the journey Predict stage and the Forecasting page. Open full forecast →

Comparison table

ScenarioRoleAssumptionsProjected KPI (6 mo)Stated impactRisk / trade-off
Base caseCurrent StateCurrent trajectory with in-flight initiatives only.0.6%Baseline—
Renegotiate top-3RecommendedReciprocal rate deals with top-3 partners.0.22%$1.1M / yr savedPartner pushback
Re-route via hubsAlternativeRoute traffic via lower-cost carrier hubs.—$1.5M / yr savedQuality risk on routes
Accept new ratesAlternativeNo renegotiation.—$0Margin keeps falling

Scenario → decision

Recommended scenario: Renegotiate top-3 — $1.1M / yr saved; trade-off: Partner pushback.

No decision is saved here; the decision is recorded in the journey at Decide.

Source data, assumptions, methodology & limitations

Source data

  • Telecom KPI data (current period, target, prior)
  • Historical KPI trend data (monthly history Apr–Sep 2026)
  • Scenario library (assumptions, results, recommended flag)
  • Value realization records (expected / actual value)
  • Evidence records

Assumptions

  • No action: continues the 6-month stored trend (+0.06 per month).
  • Recommended action: reverses the trend at the same monthly rate (no stored target).
  • Scenario outcomes, costs and risks are as stored for each scenario.

Methodology

  • Scenarios of the selected journey are ordered Current State → No Action → Recommended → Upside → Downside → Alternatives.
  • With an originating issue, alternatives sharing no words with the issue move to the bottom of the table.
  • Projected KPI per scenario uses the shared deterministic forecast; only Current State, No Action and Recommended are modelled.

Limitations

  • Scenario outcomes are governed figures stored with each scenario — they are not re-computed by a simulation engine.
  • Forecasts are straight-line projections of six stored months; they ignore seasonality, shocks and interactions between measures.
  • Many KPIs have no stored target; where absent, the recommended path reverses the trend at the same monthly rate.
  • No downside scenario is stored for any journey; downside coverage is shown as a gap rather than invented.
Forecast horizon: 6 months (KPI projection); scenario outcomes as statedModel status: deterministic arithmetic — no AI or machine-learning model.
Evidence typeItemSource
methodology

Interconnect & Roaming methodology

Reconcile wholesale billing with partner invoices; Track margin by route and partner; Flag settlement variances.

Finance Planning Dataset
limitation

Settlement timing

Partner settlements reconcile 60 days in arrears.

Billing Warehouse